Sustainable Transport Strategy

7 Up – statements we’re pleased to see

Before we get to the list this is what you can read on page 10:

We’re on the road to nowhere …

And now the statements …

1. This growth [in population from 310,100 (2021) to 365,000 (2041)] will not be possible without an integrated and sustainable transport network that allows everyone to travel from home to school, work and other key destinations across the borough and beyond, to keep Redbridge moving.  (p6). All else being equal, more people means more car journeys means Redbridge grinds to a halt.  Somethings gotta give, on yer bike – it takes up less road space. 

2. Public transport (e.g. bus, underground and rail) and active travel (walking, wheeling, cycling and scooting) networks are fragmented … and not well connected to green spaces or other key infrastructure in the borough such as transport links and places of work (p8). An honest assessment of where we are. Now’s the time for some joined up thinking.

3. Road user hierarchy for Redbridge

As night follows day, we can’t build more roads for more cars so to keep Redbridge moving we need more people to walk, cycle and take the bus. These are not virtual activities: space is required and there is only one place to find it. 

4. To keep Redbridge moving the option to choose and use sustainable travel options that involve walking, wheeling, cycling and use of public transport is needed (p15).  That’s sorting out dangerous junctions, putting cycle tracks along main roads, reducing traffic speeds and turning rat runs into quiet streets.  17 years is enough time. 

5. The transport network will enable people to access key destinations, community services and green spaces by sustainable travel options, (p17).  As above.

6. The figure provides an insight into how different neighbourhoods, centres and roads should be characterised to keep Redbridge moving and importantly rebalance street priority to ensure vulnerable user groups pedestrians and cyclists feel safe

By our reckoning that’s most of the Borough’s Road network suitable for cycling which means, Borough wide, sorting out dangerous junctions, putting cycle tracks along main roads, reducing traffic speeds and turning rat runs into quiet streets.  There’s a bit of a theme emerging here …

7. At least 2/3 of all journeys will be by public transport, walking, wheeling (i.e. using of (sic) wheelchairs and mobility scooters), cycling or scooting.  (p7).  Surely a typo?  If Redbridge does what it says it wants to do, by 2041 4/5ths is possible isn’t it?  

Redbridge Recycles are open again

We are often asked “where can I get a good second-hand bicycle”, or “what can I do with my old bike?” We are also aware that getting the bike that fits you is so important. This is one of the best local places to buy a second-hand bicycle to suit your needs.

The Salvation Army “Redbridge Recycles” run by volunteers has re-opened. This time it is in Chadwick Road IG1 1EQ. They welcome donations of old bikes/components and will re-fit them for sale to raise funds for their charity work. They are totally dependent on donations and volunteers so if you fancy offering to get involved pop in and see them when next in Ilford. Currently they are only open on Tuesday and Friday 10.00 to 14.00. They do not currently service or repair bikes. Perhaps with more volunteers they may be able to do so in the future.

Email Redbridge Recycles at ilford@salvationarmy.org.uk